Size: 103,000 Square Foot Owner: District Of Columbia Department of General Services Architect: Studio MB Scope: Design Build Renovation + Addition of all Mechanical & Plumbing LEED: LEED Gold Mechanical Design: Air and Water Sourced VRV with Packaged Outside Air Handlers Plumbing: Complete storm, sanitary, Domestic Heating & Recirculation, Domestic Cold,...

Size: 133,981 Square Foot Owner: KIPP DC Legacy College Preparatory Architect: Studio 27 Scope: Design Assist Addition of all Mechanical & Plumbing LEED: LEED Gold Mechanical Design: Air Sourced VRV with Packaged Outside Air Handler Plumbing: Complete storm, sanitary, Domestic Heating & Recirculation, Domestic Cold, Commercial Kitchen . Grease Interceptor, 2PSI...

Jones Day was a multi-phase, multi-floor tenant fit out located in downtown NW Washington, DC overlooking the capital.  This project consisted of changing out over 450 VAVs, building BMS upgrade by Johnson Controls and bathroom renovations throughout.  The B1 level - which was slab on...

HVAC & Plumbing tenant fit out of 1st, 6th, 7th & 8th floors. The mechanical system is comprised of Custom Air Handling Units, Fan Coil Units, VRF Systems, VAVs, and multiple Chillers.  Studio arrangement by AMA Consulting Engineers & Meridian Design. 400 N Capitol will serve...

Brand new building base building. LEED project. Firstsource project. After the project was awarded the mechanical system was redesigned. The building was top out before we had the new mechanical design. During coordination there were multiple design changes due to the future tenants request to...

Pro-Air upgraded the HVAC and Plumbing systems within the base building on 3 levels for future Food Hall/Retail space. HVAC system consisted of (2) Pollution Control units for the future kitchen hoods, WSHP’s, duct heaters, air curtains, split systems, electric heaters and replacing/upgrading the base...

Complete HVAC and plumbing  tenant fit-out for Baker Botts including their core restrooms, roof terrace and annex level on the 9th Floor.  The fit-out spanned four total floors at 700 K Street, floors 9-12. This project was a fast pace high end fit-out which was completed...

Two phased interior construction of 5-story cGMP manufacturing facility consisting of approximately 20,000 sq ft of cleanroom space. 1st Phase included fitout of the first floor, third floor and fourth floors including labs, offices, conference rooms, training spaces and support spaces including MEP rooms on the...

Renovation of historic boat yard to support new brewing operations. Work consisted of installation of various mechanical and plumbing systems including RTU's, fans, heaters, refrigeration piping, sanitary waste and vent, domestic water systems, drains, plumbing fixtures and various sinks, hook-ups of miscellaneous brewing equipment....