Archive

Brand new building base building. LEED project. Firstsource project. After the project was awarded the mechanical system was redesigned. The building was top out before we had the new mechanical design. During coordination there were multiple design changes due to the future tenants request to...

Pro-Air upgraded the HVAC and Plumbing systems within the base building on 3 levels for future Food Hall/Retail space. HVAC system consisted of (2) Pollution Control units for the future kitchen hoods, WSHP’s, duct heaters, air curtains, split systems, electric heaters and replacing/upgrading the base...

Complete HVAC and plumbing  tenant fit-out for Baker Botts including their core restrooms, roof terrace and annex level on the 9th Floor.  The fit-out spanned four total floors at 700 K Street, floors 9-12. This project was a fast pace high end fit-out which was completed...

Two phased interior construction of 5-story cGMP manufacturing facility consisting of approximately 20,000 sq ft of cleanroom space. 1st Phase included fitout of the first floor, third floor and fourth floors including labs, offices, conference rooms, training spaces and support spaces including MEP rooms on the...

Renovation of historic boat yard to support new brewing operations. Work consisted of installation of various mechanical and plumbing systems including RTU's, fans, heaters, refrigeration piping, sanitary waste and vent, domestic water systems, drains, plumbing fixtures and various sinks, hook-ups of miscellaneous brewing equipment....

Installation of HVAC and Plumbing systems to support new brewery expansion. Work consisted of installation of various mechanical and plumbing systems including glycol piping, steam piping, ductwork and associated devices, domestic water systems, sanitary waste and vent, installation of OFCI provide plumbing fixtures and various sinks,...

Installation of HVAC and Plumbing systems to support the new Atlantic Shores exhibit on the 3rd floor of the National Aquarium in Baltimore. Work consisted of installation of chilled water piping, sanitary waste and vent piping, domestic water systems, associated supply, return and exhaust ductwork, insulation,...

Installation of various plumbing and mechanical systems to support a new soccer field for the DC United football team. Pro-Air installed approximately 50% of the various plumbing systems and all of the HVAC systems. Work was performed against a very aggressive timeline with stringent schedule constraints...

Installation of plumbing for new ground up large restaurant and catering building. Plumbing systems included underground sanitary waste and vent systems, new above ground sanitary waste and vent, various domestic water systems, natural gas systems, and various kitchen equipment hook-ups and plumbing fixtures....