Brand new building base building. LEED project. Firstsource project. After the project was awarded the mechanical system was redesigned. The building was top out before we had the new mechanical design. During coordination there were multiple design changes due to the future tenants request to...

Pro-Air upgraded the HVAC and Plumbing systems within the base building on 3 levels for future Food Hall/Retail space. HVAC system consisted of (2) Pollution Control units for the future kitchen hoods, WSHP’s, duct heaters, air curtains, split systems, electric heaters and replacing/upgrading the base...

Complete HVAC and plumbing  tenant fit-out for Baker Botts including their core restrooms, roof terrace and annex level on the 9th Floor.  The fit-out spanned four total floors at 700 K Street, floors 9-12. This project was a fast pace high end fit-out which was completed...

Complete HVAC and plumbing tenant fit-out for Paul Hastings including their lobby area on the first floor.  The fit-out spanned over four floors not including the lobby area.  Project was designed by LSM and engineered by Dewberry.  Mechanical install was a DOAS system and each...