Archive

Pro-Air upgraded the HVAC and Plumbing systems within the base building on 3 levels for future Food Hall/Retail space. HVAC system consisted of (2) Pollution Control units for the future kitchen hoods, WSHP’s, duct heaters, air curtains, split systems, electric heaters and replacing/upgrading the base...

Complete HVAC and plumbing  tenant fit-out for Baker Botts including their core restrooms, roof terrace and annex level on the 9th Floor.  The fit-out spanned four total floors at 700 K Street, floors 9-12. This project was a fast pace high end fit-out which was completed...

Complete HVAC and plumbing tenant fit-out for Paul Hastings including their lobby area on the first floor.  The fit-out spanned over four floors not including the lobby area.  Project was designed by LSM and engineered by Dewberry.  Mechanical install was a DOAS system and each...