Archive

Contract Value $5M DC Convention Center was a multi-floor, multi gang bathroom renovation that spanned over the entire DC Convention Center. This project included both mechanical and plumbing scope, with plumbing being the primary. Plumbing renovation included replacing all water closets, urinals, wash bars, faucets, and...

Contract Value $3,243,000.00 Milbank consisted of a complete new fit-out of the 6th and 7th Floors @ 1101 New York Ave NW Washington, DC.  The project included both mechanical and plumbing scope.  Mechanical work included the installation of 121 new DOAS boxes with condenser water/condensate piping and 3...

Contract Value $5,264,800.00 Gibson Dunn was our largest high end Law Firm to date. The project was located at 1700M Street NW Washington, DC and consisted of a total remodel of floors 7-12. This project consisted of both mechanical and plumbing scope, mechanical included 175 DOAS...

USDA Wing 7 project encompass the modernization of approximately 250,000 square feet of space to update failing infrastructure. The project included the installation of major HVAC equipment, including , 1 screw chiller, 1 scroll chiller, 2 energy recovery units, 376 fan coil units, 8 HVAC...

Contract Value $3,824,700.00 Davis Polk was a completely new tenant build @ 1050 17 Street NW Washington, DC that included floors 8-12 with the addition of the 7th floor.  The scope included both mechanical and plumbing scope with all ATC work by JCI under our umbrella.  Mechanical...

This is a core and shell warehouse build with an office fit out, conveniently located at 3700 Forestville Road, District Heights, MD. The mechanical system is comprised of standalone RTUs, Split Systems, Unit Heaters, Exhaust Equipment, and HVLS - high velocity low speed fans. Full...

Watkins is an out of the ground 4 -story white box fitted out for future Pharma/Lab space. The HVAC scope included new ductwork, RTUs, air curtains, electric heaters, fans, VRF system and FCUs. Plumbing consisted of a full underground piping system including acid waste, along...

Jones Day was a multi-phase, multi-floor tenant fit out located in downtown NW Washington, DC overlooking the capital.  This project consisted of changing out over 450 VAVs, building BMS upgrade by Johnson Controls and bathroom renovations throughout.  The B1 level - which was slab on...

HVAC & Plumbing tenant fit out of 1st, 6th, 7th & 8th floors. The mechanical system is comprised of Custom Air Handling Units, Fan Coil Units, VRF Systems, VAVs, and multiple Chillers.  Studio arrangement by AMA Consulting Engineers & Meridian Design. 400 N Capitol will serve...

Brand new building base building. LEED project. Firstsource project. After the project was awarded the mechanical system was redesigned. The building was top out before we had the new mechanical design. During coordination there were multiple design changes due to the future tenants request to...