This is a core and shell warehouse build with an office fit out, conveniently located at 3700 Forestville Road, District Heights, MD. The mechanical system is comprised of standalone RTUs, Split Systems, Unit Heaters, Exhaust Equipment, and HVLS - high velocity low speed fans. Full...

Watkins is an out of the ground 4 -story white box fitted out for future Pharma/Lab space. The HVAC scope included new ductwork, RTUs, air curtains, electric heaters, fans, VRF system and FCUs. Plumbing consisted of a full underground piping system including acid waste, along...

Jones Day was a multi-phase, multi-floor tenant fit out located in downtown NW Washington, DC overlooking the capital.  This project consisted of changing out over 450 VAVs, building BMS upgrade by Johnson Controls and bathroom renovations throughout.  The B1 level - which was slab on...

HVAC & Plumbing tenant fit out of 1st, 6th, 7th & 8th floors. The mechanical system is comprised of Custom Air Handling Units, Fan Coil Units, VRF Systems, VAVs, and multiple Chillers.  Studio arrangement by AMA Consulting Engineers & Meridian Design. 400 N Capitol will serve...

Brand new building base building. LEED project. Firstsource project. After the project was awarded the mechanical system was redesigned. The building was top out before we had the new mechanical design. During coordination there were multiple design changes due to the future tenants request to...

Pro-Air upgraded the HVAC and Plumbing systems within the base building on 3 levels for future Food Hall/Retail space. HVAC system consisted of (2) Pollution Control units for the future kitchen hoods, WSHP’s, duct heaters, air curtains, split systems, electric heaters and replacing/upgrading the base...

Complete HVAC and plumbing  tenant fit-out for Baker Botts including their core restrooms, roof terrace and annex level on the 9th Floor.  The fit-out spanned four total floors at 700 K Street, floors 9-12. This project was a fast pace high end fit-out which was completed...

Complete HVAC and plumbing tenant fit-out for Paul Hastings including their lobby area on the first floor.  The fit-out spanned over four floors not including the lobby area.  Project was designed by LSM and engineered by Dewberry.  Mechanical install was a DOAS system and each...