Paragon BioServices – BWI Expansion Phases 1, 1A & 2

Location

Harmans, MD

Category
Life Sciences
About This Project

Three phased construction of cGMP validated production facility including the HVAC and Plumbing work in an existing core and shell building.

Included:

  • Construction of (10) GMP production suites, approximately 10,000 sq. ft. per suite.
  • Purchase and install of (15) new semi-custom AHU’s and associated piping and ductwork including steam humidifiers integral to each unit.
  • Installation of (17) packaged RTU’s with natural gas reheat.
  • Installation of (2) DOAS units with natural gas reheat.
  • Installation of (9) BAF (Stratification Fans) in new office area. Installation of New supply, return and exhaust ductwork for corridors, support spaces and cleanrooms.
  • Installation of (72) duct mounted reheat coils and associated controls.
  • Installation of a 3000-Ton water cooled modular chiller plant complete with cooling towers, pumps, piping, electrical panels, controls, water treatment, filtration, etc.
  • Installation of (50) exhaust fans for GMP areas and associated support spaces including associated ductwork and controls.
  • Purchase and install of (69) new 4-pipe FCU’s for general corridors, mechanical rooms and support spaces.
  • Installation of (24) supply/exhaust VAV boxes for QC Lab areas.
  • Installation of (4) separate VRF systems including a total of (62) ducted indoor FCU’s and associated refrigeration piping.
  • Installation of (6) 90 BHP modular vertical boilers with associated controls system and flue piping for HHW generation.
  • Installation of (1) 150 BHP modular steam boiler with associated controls system and flue piping, packaged chemical treatment, and condensate return system.
  • Installation of (1) steam-to-water heat exchanger.
  • Installation of (5) 15 HP vertical in-line pumps for Heating Hot Water system and (3) 30 HP vertical in-line pumps for Chilled Water system.
  • Installation of (33) safety shower units and associated safety shower piping fed from (2) Guardian packaged tempered water skids.
  • New sanitary waste and vent piping to accommodate new floor sinks, floor drains, laboratory scullery sinks and water heater installation.
  • Installation of underslab process drainage system consisting of Blucher SS pipe and fittings.
  • Installation of above grade process vent system consisting of CPVC piping.