About This Project
Interior renovation of existing cGMP validated laboratory facility including the HVAC and Plumbing work.
- Purchase and install of new AHU-5 and associated piping and ductwork including RO/DI fed steam humidifier.
- Installation of new HEPA filters and fan powered HEPA filter units for cleanroom spaces. New supply, return and exhaust ductwork for corridors, support spaces and cleanrooms.
- Replacement of (2) existing roof top condensing units and associated refrigerant piping for existing indoor AHU’s.
- Installation of new safety shower units and associated safety shower piping and master thermostatic mixing valve.
- New sanitary waste and vent piping to accommodate new floor sinks, floor drains, laboratory scullery sinks and water heater installation.
- Purchase and install of new ASME rated 200 Gallon domestic hot water heater and associated master mixing valve, piping, etc.